PRE-AWARD POLICIES AND PROCEDURES
A proposal is a request for support of sponsored research, instruction, or
extension projects, and generally consists of a cover page, brief project
summary, technical or narrative section, biographical sketches of the key
personnel, and a detailed budget. Common proposal types include:
Solicited proposals, submitted in response to a specific
solicitation issued by a sponsor. Such solicitations, typically called
Request for Proposals (RFP), Request for Quotations (RFQ), Broad Agency
Announcements (BAA), NASA Research Announcements (NRA), or Requests for Bids
(RFB), are usually specific in their requirements regarding format and
technical content, and may stipulate certain award terms and conditions.
Unsolicited proposals, submitted to a sponsor that has not
issued a specific solicitation but is believed by the investigator to have
an interest in the subject.
Pre-proposals, requested when a sponsor wishes to minimize
an applicant’s effort in preparing a full proposal. Pre-proposals are
usually in the form of a letter of intent or brief abstract. After the
pre-proposal is reviewed, the sponsor notifies the investigator if a full
proposal is warranted.
Continuation or Non-Competing proposals confirm the
original proposal and funding requirements of a multi-year project for which
the sponsor has already provided funding for an initial period (normally
one-year). Continued support is usually contingent on satisfactory work
progress and the availability of funds.
Renewal or Noncompeting proposals are requests for
continued support for an existing project that is about to terminate, and,
from the sponsor’s viewpoint, generally have the same status as an
unsolicited proposal.
The Office
of Sponsored Programs (OSP) assists faculty and staff in identifying funding
sources and maintains a comprehensive electronic collection of sponsor
guidelines. They include generalized and special interest grant directories and
other publications that enable clients to locate potential sponsors. The OSP
subscribes to a number of publications, including the, including the
Federal Register,
the Commerce Business Daily,
COS, and
SPIN+.
The Office of Sponsored Programs Newsletter lists a wide range of
upcoming funding opportunities and announces changes in University and
sponsor policies that affect sponsored projects. Each month the newsletter
publishes a list of awards received by the University with the intent of
fostering collaboration among researchers.
The newsletter is distributed automatically to all faculty,
directors, and department heads, and by request to deans, department research and
administrative staff. There are several types of Funding Sources for Grants
and Contracts.
They include:
- Foundations
- Corporations
- Federal government
- State government
- City government
- Quasi-government/Local
- Institutes of Higher Education
Potential proposal developers may have an idea and sometimes may have a
fully developed proposal in hand but they do not have a funding source. It
is the responsibility of the Office of Sponsored Programs to review the
proposal and then find funding sources that may best fit the concept of the
proposal.
There are various databases available to the faculty and staff at NSU,
however the faculty and staff sometimes feel anxious about trying to
maneuver those sources. To make the process as easy and painless as
possible for the proposal developer, we assist them in pulling the
information needed.
The Office of Sponsored Programs provides links to several databases that
can be used in retrieving relevant funding sources that are suited to your
particular program or research interest.
They are:
Requests for Proposals (RFP's) are announcements in which potential sponsors
predetermine activities to be funded along with methodology and related
technical matters. RFP's from government agencies will appear daily on this
website. A "statement of work", guidelines and instructions, agency contact
personnel and submission deadlines are also included in the RFP. Once you
receive the RFP you can begin to write your proposal remembering to follow
statement of work and all other guidelines/instructions in the announcement.
When responding to an RFP, RFQ, NRA, BAA or RFB with the proposed terms
and conditions stated in the solicitation the investigator should notify OSP by completing and submitting an Intent to Submit form. The investigator should also
forward a copy of the solicitation to the OSP as soon as possible. Please
be sure to discuss and review your proposal concept with directors,
department heads and/or deans.
Develop detailed budget maintaining strict adherence to University, state
and agency guidelines. The following chart shows
the types of match and the signatory required.
Table 1
| Required Routing |
Terms & Conditions |
| PI/PD,
Department Head, Dean/Director, Office of Sponsored Programs |
With no
University Match |
| PI/PD,
Department Head, Dean/Director, Appropriate Vice President,
Sponsored Programs |
With
University Match |
| PI/PD,
Department Head, Dean/Director |
Release
time Match |
| PI/PD,
Department Head, Dean, Vice President Academic Affairs, Office of
Sponsored Programs |
Equipment
Trust |
When developing your proposal the following concerns/needs should be
addressed.
- Identify the need for animal care, human subjects
protection, biohazard or other relevant research issues. For further
information refer to the
Special Reviews section.
- If any of the above-mentioned research is applicable
the necessary form should be completed. The forms can be downloaded
from the Office of Sponsored Programs webpage.
- Identify potential intellectual property products.
For further information refer to the
Special Reviews section.
- If intellectual property is involved, the intellectual
property form should be completed. The intellectual property form can
be downloaded from the Office of Sponsored Programs webpage.
- If the proposal is a partnership or collaborative
venture, a teaming agreement should be completed. The sample teaming
agreement form can be downloaded from the Office of Sponsored Programs
webpage. For further information refer to the
Special Reviews section.
Once you have addressed the above concerns and completed your proposal you
should complete execution of the Internal Approval Form (IAF), including
appropriate signatures. The Internal Approval Form (OSP Form 100) can be
downloaded from the OSP webpage.
The internal approval form must accompany every proposal submitted to
OSP. The IAF provides OSP with information on where to submit the proposal
and identifies what compliance issues exist and what institutional resources
are required for the project. Investigators are responsible for completing
the IAF and, by signing it, accept full responsibility for the project. The
Internal Approval Form along with your proposal should be submitted to the
Office of Sponsored Programs at least ten days prior to proposal due date and
ten days prior for a collaborative proposal.
In addition to the investigator’s signature, the IAF must also be signed
by the department head or chair and Dean or Center Director. Investigators
requiring signatures for cross-unit or interdisciplinary proposals should
take into consideration the additional time needed to obtain the cross-unit
signatures. The following is a suggested timetable for proposal submission
and review.
Table II
| Time Frame |
Detail |
| Thirty to forty-five
days prior to submission date |
Inform Office of
Sponsored Programs of Intent to Submit by completing the OSP Intent to Submit form. |
| Thirty to forty-five days
prior to submission |
Preliminary research and proposal development |
| Thirty days prior to
submission date |
Write abstract |
| Twenty-five to thirty
days prior to submission date |
Complete proposal draft and submit to OSP |
| Twenty to ten days
prior to submission |
Write proposal
revisions |
| Ten to ten twenty days prior to submission date |
Complete proposal revisions
|
| Five days prior to submission date |
Final review and submission of proposal to Sponsor
|
Occasionally a sponsor may require an institutional cover letter or
letter of support from the President. These letter requests should be
received by OSP at least ten business days before the deadline. In addition
to the required internal review, additional time is necessary to obtain a
signature due to the President’s extensive travel schedules. Investigators
are strongly urged to coordinate their proposal schedule with the OSP as soon as
the proposal deadline is known.
All proposals should be submitted to the OSP electronically and on a CD, flash drive or other USB mass storage device.
Proposal forms and guidelines are available on the Office of Sponsored
Programs web page.
Your plans or goals should be written in a clear and concise manner.
- Be original and innovative.
- Explain the significance of the work to be undertaken.
- Be sure that what you propose is possible and
plausible.
- Follow instructions. Reviewers notice if you use a 10
point font when the instruction requires a 12 point font, it is
imperative that sponsor guides be explicitly followed.
- Stay within the page limitations.
- Be sure that your budget is well-justified and that it
adds properly.
- Proofread several times for errors and be sure to
execute a spell check.
Format and Content
Most federal sponsors publish guidelines that list proposal requirements and instructions on how to prepare a proposal. They
also require the use of specific forms, most of which can be obtained from this website.
Sponsors frequently revise proposal guidelines and other requirements
(e.g., page limits, font sizes, margins, number of copies). Guidelines can
vary not only between sponsors, but also among programs within an agency.
Questions concerning proposal requirements that are not addressed in the
sponsor’s guidelines can usually be answered by OSP staff. In general, both
federal and non-federal sponsors require the following:
Cover or Title Page: This should include the title of the
proposed project, name(s) and title(s) of the principal investigator and
co-investigators (if any), proposed project period, dollar amount,
sponsor, the date, and any required school or department signatures. As
the legal entity submitting the proposal on behalf of the investigator,
NSU, with OSP’s address, should be used for the institutional address.
Introduction: A brief description of the proposed project’s
objectives, any direct or closely related work which may be in progress,
and any other pertinent background information as required by the
sponsor.
Table of Contents or index with page references.
Detailed Program Description, including an explanation of the
objectives in clear and concise terms, and a description of the
procedures to be followed in carrying out the objectives.
Description of Current Facilities and Equipment, and the
percentage of time it will be available for the proposed project.
List of Personnel: Include the names and titles of all
professional personnel. Since named personnel might be used within key
personnel clauses in an agreement, nonprofessional personnel should be
listed by title or function only.
Curriculum Vitae of Key Personnel: Include only professional
and academic essentials and avoid personal background information.
List of Principal Investigator’s Publications: Include only
those that are relevant or significant to the proposed project. The
list should include items such as publications being printed, or invited
lectures.
Budget with Justifications and Supporting Documentation, where
appropriate.
Concurrent submissions: When the same proposal is being
submitted to other sponsors a statement should appear in each proposal
indicating that it is a concurrent submission.
List of Personnel’s Current or Pending Support: Indicate
a) the source of support, b) project title, c) percent of effort; d)
dates of project period, e) annual costs, and f) how this project does
not overlap or duplicate projects supported by other funds. The
statement “No overlap” is considered insufficient by most sponsors.
If required, include letters of collaboration, endorsement
letters subcontractor
proposals, and other supporting documentation.
Special requests or justifications: These could include: a
change of principal investigator on renewal or continuation proposals,
use of unexpected funds from a prior budget period, or the temporary
absence of the principal investigator.
Certifications and representations and other forms that may be
required. These should be prepared by the department for signature
by OSP.
Estimating Your Budget
It is crucial for investigators to closely follow the sponsor’s
instructions when preparing a budget. A competitive budget is one that will
provide the sponsor with a complete financial picture of the proposed
project. Budget should be allowable, allocable and reasonable.
A budget is reviewed by the sponsor to verify if the costs are reasonable
and necessary to carry out the proposed project, and if it conforms to the
sponsor’s instructions. During award negotiations a budget is sometimes
subjected to further analysis by the sponsor’s audit staff. Investigators
and department administrators should refer questions to the OSP staff.
Direct Costs
Typical budget categories include personnel, employee benefits,
equipment, travel, materials and supplies (refer to OMB Circulars A-21,
A-87, A-122, A-102, A-110, and A-133). Some budgets may need categories for
publication costs, consultants, or subcontracts. In most instances the
direct costs should be reflected by major budget categories with an attached
narrative detailing how the costs were calculated. The budget narrative
should contain enough detail for the sponsor to verify the appropriateness
of the costs.
Certain costs are unallowable on projects. Unallowable costs, along with
allowable costs, are explained in detail in Agency Guidelines.
In addition to the greater level of budget detail that may be required
prior to making an award, some sponsors will perform their own audit or
request an audit by the Defense Contract Audit Agency (DCAA), NSU’s
cognizant audit agency. The purpose of the audit is to verify costs and
rates, and is the basis for which budget estimates have been determined. In
some cases an audit is conducted by telephone, while others involve on-site
visits by a DCAA audit team.
Salary compensation should be based on the percent of time the
employee will spend on the project. Example: (monthly salary rate) x___% of
effort x number of months. If the project is multi-year include a 5%
annual increase. Check with OSP for forward projections of increases.
Salary requests for non-University people should be listed under the
category of “Consultants”. Consultant payments are not salary or wage
payments and should be listed as a separate line item under consultants.
Hours and/or rates and/or hourly rates are occasionally a
requirement for proposals. Always include the following note when reporting
hours:
Hours – The estimate of hours and/or hourly rates are furnished
solely for the purpose of this proposal. It is understood that the
University will be required to maintain a record of hours of effort
under any resultant award.
A similar note should be included in proposals that require a cost by
task or project breakdown.
Fringe Benefits are expenses directly associated with employment
and are applicable to all University salaries and wages. All
full-time salaries carry a fringe benefit rate of 39%. Part-time staff and
wage payroll personnel benefits are 7.65%.
The following budget note may be used:
Facilities and Administrative
Costs (Indirect Costs) are those costs that benefit common or joint
objectives and cannot be identified readily and specifically with a
particular sponsored program, instructional activity or other institutional
activity.
In addition to direct costs, sponsored projects are also charged facilities and administrative costs. Facilities and administrative
costs are charged to a project by applying a percentage (the facilities and
administrative cost rate) to the total direct costs of the project minus
certain exclusions. Facilities and administrative costs rates are proposed
annually by NSU to the Department of Health & Human Services using the
federal cost principles detailed in OMB Circular A-21 (Cost
Principles for Educational Institutions).
The proposed rates are then audited by the federal government and
negotiated by the University Controller with the government’s
representative. The calculation results in a facilities and administrative
cost rate that is applied to certain direct costs, in order to arrive at the
indirect costs that are charged to a project.
The fixed rate for July 01, 2005 through June 30, 2008 is as follows:
On-Campus Rate: Total Modified Direct x 37% = F & A (Indirect costs)
On-Campus Formula: All direct costs, excluding capital
expenditures (buildings, individual items of equipment in excess of
$5,000.00, alterations and renovations) and that portion of each subaward in
excess of $25,000.00 x 37%. The resulting balance x 37% = On-campus F & A
(Indirect costs).
Off-Campus Rate: Total Modified Direct x 24.8% = F & A (Indirect costs)
Off-Campus Formula: All direct costs, excluding capital
expenditures (buildings, individual items of equipment in excess of
$5,000.00, alterations and renovations) and that portion of each subaward in
excess of $25,000.00 x 24.8%. The resulting balance x 24.8% = Off-campus F &
A (Indirect costs).
Cost-sharing
Under certain circumstances it may be appropriate or required for NSU to
share the costs of a project. Cost-sharing under a federal program is
subject to Office Management and Budget (OMB) Circular A-110
(Grants and Agreements With Institutions of Higher Education, Hospitals, and
Other Nonprofit Organizations: Uniform Administrative Requirements).
A-110 stipulates that the cost-sharing must come from non-federal sources
and contribute directly to the proposed project. Proposals listing
cost-sharing should explain how the cost-sharing commitments will be met.
The actual cost-sharing is auditable and subject to verification.
Cost-share commitments should be discussed with OSP and department head well
in advance of the proposal deadline.
Sponsored
Program Responsibilities
OSP is available to assist as needed the investigator/director and/or
unit in any phase of proposal preparation. Proposals are carefully reviewed
to ensure that they comply with all University, sponsor, and/or State
requirements, and are prepared in such a way as to meet with favorable
reviews during competition. Proposals are reviewed for the following
criteria:
- Proposal format and content must comply with sponsor
guidelines;
- Budget must reflect adequate resources and costing
detail to accomplish the project and complies with sponsor, University
and State guidelines;
- Review of IAF for appropriate signatures and
investigator compliance with relevant special reviews;
- Verification of cost-share commitments and/or matching
funds;
- Verification of documentation for subcontractor and/or
consultants; and
- Review and signature of certifications and
representations, OSP then prepares a transmittal letter and forwards the
proposal as appropriate.
Consortiums/Joint Proposals/Subcontract Agreements
Research to be conducted by NSU and one or more other parties
as a joint venture or partnership will occasionally raise questions
concerning the legal relationship and liability of each party. When such
questions arise OSP will review the arrangement and/or special concerns with
University Counsel, unless the arrangements are clearly intended to
establish a traditional contractor-subcontractor, consortium, or joint study
relationship. Investigators/directors cannot contractually commit the
University. When NSU is the lead institution OSP requires a statement from
each participating organization that includes a full cost budget and scope
of work.
A sample subcontract agreement can be downloaded in word format.
Teaming Agreement
In the case of consortiums/joint proposals a Teaming Agreement may be
needed. A Teaming Agreement is a document that shows whereby a prime
contractor and subcontractor agree to combine resources to partner on a
major opportunity. Typically, this agreement includes the actual bid of the
subcontractor as an exhibit.
A sample agreement can be viewed in Word format.
A sample agreement can be viewed in pdf format.
Non-Disclosure Agreement
In instances where confidentiality is an issue a confidentiality
agreement, also known as non-disclosure agreement (NDA) is needed. NDAs are
agreements by which one or more parties, standing in a confidential
relationship to each other, promises to keep secret certain information
acknowledged by the parties to be confidential or trade secrets. A
non-disclosure agreement shows a recipient's rights and obligations in
respect to confidential information.
A sample agreement can be viewed in Word format.
A sample agreement can be viewed in pdf format.
ConsultantsConsultants are independent
contractors and not employees or agents of the University. Special review
and approval procedures are required if a project anticipates using
consultants. Designation of independent contractor status is governed by
the Internal Revenue’s Code of Common Law. NSU may be subjected to
significant institutional tax penalties should the individual be incorrectly
classified as an independent contractor. In addition, contracting with an
independent contractor may expose the University to significant financial
risk if the consultant has limited net worth or inadequate insurance
coverage. Questions concerning the use or status of an independent
contractor should be directed to your OSP well in advance of the proposal
deadline.
Contracts
At the time of proposal submission a sponsor will often require an
indication of what terms and conditions will be acceptable to NSU in the
event of an award. Exceptions to a sponsor’s terms and conditions are
addressed by the OSP in a transmittal letter. For commercial sponsors OSP
will often include a copy of the standard NSU agreement. Investigators who
are aware of special sponsor requirements should discuss them with their OSP
well in advance of the proposal deadline. NSU will normally only enter into
agreements that adhere to the following principles: the research is
conducted on a best efforts basis without guarantee of success and without
financial risk or liability to the University; costs are fully reimbursed
unless cost-sharing has been approved; and, there are no restrictions on the
dissemination of the research results except: 1) those that relate to the
protection of a sponsor’s proprietary information; 2) the rights of privacy
of individuals; or 3) establishing rights in patentable inventions and other
intellectual property.
Limited Proposal Submissions
Some sponsors limit the number of nominations or proposals that NSU may
submit to a particular program. When this situation occurs OSP will
carefully base their decision on who gets to submit on who sends in their
proposal first, the quality of both submissions and input from appropriate
Vice Presidents.
A number of internal review and approval procedures may be required before
proposal submissions, or before an award can be accepted by the university.
All necessary reviews and approvals should be initiated before OSP’s
proposal review process, thereby avoiding last minute delays.
Intellectual Property
Intellectual property is addressed in the terms and conditions negotiated
by OSP when accepting an award. For most awards NSU will retain ownership
of intellectual property developed on sponsored projects in order to avoid
conflicting commitments to various sponsors. In the case of patents, policy
requires the University to retain ownership unless a special waiver is
approved.
The Intellectual Property agreement can be pulled in Word format.
The Intellectual Property agreement can be pulled in PDF format.
As with patents, NSU prefers to retain ownership of copyrights. In some
instances NSU will allow the sponsor to own the copyright on deliverable
reports, while retaining the right of use for University purposes.
Animals
The use of animals, either for research or instruction, must be reviewed
and approved by the Institutional Animal Care and Use Committee (IACUC).
Some sponsors require that approval be obtained prior to submission of a
proposal, or within a specified time after submission. If required by a
sponsor, OSP will forward animal protocol to the IACUC Committee for
action. In no case may animals be purchased, utilized, or handled without
formal prior IACUC approval.
Institutional Animal Care and Use Committee Policy
Human Subjects
The Human Subjects Protection Committee, as required by Federal law, acts
as the institutional review board for research on human subjects at NSU
regardless of the source of funds. All uses of humans as subjects
(including survey respondents) must be reviewed and approved by the Human
Subjects Protection Committee prior to starting the research.
Guidelines for Submitting Protocols to the Institutional Review Board (IRB)
Resources & Links:
Human Subject IRB Form Internal OSP Form 103
Human Subject IRB Form External OSP Form 104
In compliance with PHS regulation (42 C.F.R. Part 50, Subpart A) the OSP has
in place procedures for Responding to Allegations of Scientific Misconduct.
Scientific Misconduct means fabrication, falsification, plagiarism, or other
practices that seriously deviate from those that are commonly accepted
within the scientific community for proposing, conducting, or reporting
research. It does not include honest error or honest differences in
interpretations or judgments of data.
The Scientific Misconduct Policy can be downloaded in Word
format.
This office will work exhaustively to protect the reputation and position of
good faith whistleblowers as outlined in the
Office for Research Integrity's Handbook for Institutional Research
Integrity Officers.
OSP staff will place major importance on fostering a research
environment that discourages misconduct in research efforts as
outlined in (42 C.F.R. Part 50, Section 105) as well as encourage
researchers in cultivating new and innovative research ideas.
Approval is evidenced by signatures on the proposal and on the University’s
Internal Approval Form (IAF). After the Principal Investigator (PI)/Project
Director (PD) and any co-investigators have signed the final version and
signed the IAF, the proposal must be approved by the Department Head and
Dean and forwarded to OSP.
After Campus/Unit review and approval (as evidenced by the signatures on
the IAF), proposals are submitted to the Office of Sponsored Programs.
OSP reviews the proposal and budget and the PI/PD secures the required
authorized University signatures.
OSP assigns a number to the proposal for data entry and submits the
proposal to the sponsor as per instructions on the RFP, RFB, RFQ, and BAA.
The University assumes legal responsibility for funded projects and the PI
is responsible for the management, activities and technical reporting
activities.
The PI/PD must maintain contact with the sponsor’s technical monitor and
comply with all technical reporting requirements. The PI/PD must also
initiate correspondence with the sponsor’s administrative or contract
monitor to request programmatic or budgetary changes. All such requested
revisions should be routed through OSP for appropriate approval signatures.
Table III
Proposal Development and
Sponsored Programs Management
YOUR RESPONSIBILITY (Project Director
(PD)/Project Investigator (PI)) |
Proposal Preparations and
Processing Responsibilities of Project Directors and/or Principal Investigators
|
Program Management Responsibilities of the Project Director or Principal Investigator
|
- Notifies Office of Sponsored
Programs (OSP) of intent to submit
- Coordinates with OSP during
proposal development
- Researches and develops
proposal information and components
- Produces and types each draft
and the final proposal in electronic format
- Complies with sponsor
guidelines and requirements
- Verifies of University and
other resource availability
- Reviews program concepts with
directors, department heads, deans, and/or appropriate
supervisors
- Develops of detailed budget
- Completes execution of Internal
Approval Form (IAF)
- Identifies animal care, human
subject protection, DNA, or other relevant research issues
- Identifies potential
intellectual property products
- Secures all University and/or
partners hierarchy approvals
- Secures OSP access and approval
for electronic submissions
- Identifies and secures approval
of desired space use
- Secures Letters of support
(supervisors, partners, etc.)
|
- Oversees Day-to-Day management
of all program activities
- Monitors all IFAS entries
- Reviews GL-19 Report monthly
for accuracy and make/pursue adjustments accordingly
- Implements program objectives
- Maintains director or
investigator expense ledger
- Generates an Account Directors
Summary Report and resolves open commitments monthly
- Selects, supervises, and
evaluates of program staff
- Works with HR to create
personnel positions
- Ensures timely completion of
NSU and sponsor program reports
- Generates paperwork to create
special program accounts
- Sends early warning of
successes and problems to the OSP
- Follows paperwork through
systems
- Secures OSP clearance for all
contacts with sponsors
- Complies with University use
policy for AMEX Small Purchasing and Travel cards
- Meeting sponsors reporting requirements and all reporting requests of OSP.
|
| OUR RESPONSIBILITY (Office of Sponsored
Programs - OSP) |
Proposal Preparation and Processing Responsibilities of the Office of Sponsored Programs
|
Program Management Responsibilities of the Office of Sponsored Programs
|
- Identifies potential sponsors
- Provides training and assists
with development of draft and final proposals
- Conducts compliance review
- Reviews and approves University
commitment
- Assesses University liability
- Reviews format and content
- Assists in identifying and
approval of cost-sharing plans
- Reviews and approves budget
proposal
- Reviews and approves of
Internal Approval Form
- Approves partnering plans
- Processes Assurances
- Prepares transmittal letters
- Performs Final Review Authority
for all NSU proposal submissions
- Prepares NSU Official letters
of support
- Copies, Package, and mails
proposals
- Completes electronic submission
of proposals
- Provides Instruction for
accessing sponsored programs resources
|
- Provides administrative
oversight for University sponsored programs
- Serves as Official University
negotiator for sponsored program agreements
- Serves as Final approval point
for sponsored program activity
- Serves as designated reviewer
for the Research and Technology
- Serves as Official University
contact for government and other sponsors for all sponsored
program activity
- Serves as Official reviewer of
sponsored program agreements
- Monitors program compliance
issues for sponsored programs
- Completes and reviews requests
for all extension requests
- Reviews reports to sponsors,
prior to submissions by directors
- Coordinates between sponsors
and directors/investigators interactions on program matters
|
Table IV
| Address (for all official correspondence) |
Norfolk State University, Office of Sponsored Programs, 700 Park Avenue,
McDemmond Center for Applied Research (MCAR), Suite 601, Norfolk, VA
23504 |
|
Type of Organization |
State Related Institution of Higher Education |
|
Congressional & Senate District (Federal) |
VA-03 Congressional and Senate District |
|
VA Representative District (State) |
Rep. Yvonne Miller - 5th District |
|
Authorized University Official for all Proposals, Certification &
Agreements |
Paula R. D. Shaw, Director, Office of Sponsored Programs, 700 Park
Avenue, MCAR, Suite 601, Norfolk, VA 23504 Phone: (757) 823-9053 Fax:
(757) 823-2823 E-mail:
pshaw@nsu.edu
|
|
Official Authorized to Sign Listed Agreements |
Paula R. D. Shaw, Director, Office of Sponsored Programs, 700 Park
Avenue, MCAR, Suite 601, Norfolk, VA 23504 Phone: (757) 823-9053 Fax:
(757) 823-2823 E-mail:
pshaw@nsu.edu
|
|
Financial Contact |
Sarah J. Green, Senior Accountant, Grants and Contracts Accounting, 700
Park Avenue, Norfolk, VA 23504 Phone: (757) 823-2376 Fax: (757) 823-2377
E-mail:
sjgreen@gnsu.edu |
|
Contractual Contact, Business Contact and Proposal Contact |
Paula R. D. Shaw, Director, Office of Sponsored Programs, 700 Park
Avenue, MCAR, Suite 601, Norfolk, VA 23504 Phone: (757) 823-9053 Fax:
(757) 823-2823 E-mail:
pshaw@nsu.edu
|
|
University General Counsel |
Pamela Boston, General Counsel and Special Assistant Attorney General,
700 Park Avenue, Norfolk, VA 23504 Phone: (757) 823-2294 Fax: (757)
823-2288 E-mail:
pfboston@nsu.edu
|
|
IRS Employer ID Number
(Internal Revenue Service)
|
54-6002808-041 |
|
Federal Entity Identifier |
54-6002808 |
|
DUNS Number
(Data Universal Numbering System)
|
074754805 |
|
CAGE Code
( Contractor and Government Entity)
|
6Y311 |
|
FICE Code
(Federal Interagency Committee on Education)
|
003765 |
|
State Identification Number |
30546002808F001
|
|
OPE ID Number
(Office of Postsecondary Education)
|
00376500 |
|
OPEDS ID Number
(Office of Postsecondary Education Data System)
|
232937 |
|
NIH IPF Number
(National Institutes of Health, Institutional Profile File)
|
504401 |
|
Cognizant Agency/Contract Administration Office (F & A rate approvals)
|
Department of Health & Human Services (DHHS) |
|
Date of last Negotiation of Facilities
and Administration Rate (F & A)
Negotiated Rate
|
July 7, 2005
The fixed rate for July 1, 2005 through June 30, 2008 (or until
renegotiated) is 37%for on-campus or 24.8% for off-campus of total
direct costs excluding capital expenditures (buildings, individual items
of equipment in excess of $5,000, alterations and renovations) and that
portion of each sub-award in excess of $25,000. |
|
Filing date for Misconduct in Science |
TBA |
|
Fringe Benefit Rate |
Full time: 2009 - 40.0% 2011 - 41.0% Part time: 7.65% Ongoing
2010 - 40.5% 2012 - 41.5% |
|
E2F |
Enterprise
and
Empowerment
Foundation
|
|
MCAR |
McDemmond
Center
for
Applied
Research |
|
RISE |
Research
&
Innovations
to
Support
Empowerment
|
|